Volharding Shipyard Werkendam

Outfitting project
Opus One

Future-ready outfitting project,
prepared for sustainable fuels and flexible deployment

Specifications

Length: 135 m
Width: 17.55 m
Cargo capacity: approx. 8,600 tonnes
Delivered: 2025

Opus One

Project highlights

During the outfitting project, the ship was prepared for methanol transport and designed for deployment across different cargoes.

The outfitting included the installation of an automated pumping and tank cleaning system.

The ship complies with the latest sustainability and emission requirements and is equipped with modern propulsion technology. In addition, Seafar technology has been installed, enabling remote support and monitoring.

The aluminium floor plates in the engine room were custom-made and installed in-house. The complete piping system was also engineered, fabricated and integrated into the ship at our shipyard.

The combination of technology and flexibility makes the ship suitable for future developments and a wide range of operational applications.

Opus One aluminium floor

Key features

• Prepared for methanol transport.
• Suitable for a wide range of cargoes.
• Automated pumping system.
• Modern propulsion technology meeting the latest requirements.
• Seafar technology for remote support and monitoring.